PRODUCT CATEGORY
& APPLICATION
BIOCHEMICAL EQUIPMENT
CHEMICAL RESEARCH
CHROMATOGRAPHY
EXTRACTION EQUIPMENT
LABORATORY THERMOSTATIC PRODUCTS
MIXER, ROTARY EVAPORATOR
OTHER LABORATORY EQUIPMENT
SAMPLE PREPARATION
WEIGHING
Education and Training Kits
AERODYNAMICS EDUCATION
CHEMICAL EDUCATION
ELECTRICAL EDUCATION
ELECTRONICS EDUCATION
ENERGY EDUCATION
ENVIRONMENT EDUCATION
MECANICS EDUCATION
MECHATRONICS & AUTOMATION EDUCATION
TELECOMMUNICATIONS EDUCATION
THERMODYNAMICS & THERMOTECHNICS
Electrical Test Equipment
BATTERY TEST EQUIPMENT
CABLE TEST EQUIPMENT
CIRCUIT BREAKER TEST EQUIPMENT
CURRENT TESTER
EARTH/GROUND RESISTANCE TESTERS
INSULATION TESTER
LOOP & RCD TESTERS
MULTIMETER
POWER LOGGERS, METERS & ANALYZERS
RELAY TEST EQUIPMENT
SAFETY TESTER
TRANSFORMER TEST EQUIPMENT
Electronics Test Equipment
CAPACITANCE, INDUCTANCE AND RESISTANCE TESTERS
DATA LOGGERS AND DATA ACQUISITION SYSTEM
FUNCTION, SIGNAL & WAVEFORM GENERATOR
MULTI PURPOSE SWITCH SYSTEMS
OSCILLOSCOPE
POWER SUPPLIES
Environmental and HVAC Test Equipment
FLOW METER
GAS & COMBUSTION METER
INDOOR AIR QUALITY
LEAK DETECTOR
MULTI PARAMETER LIQUID METER
PRESSURE TEST EQUIPMENT
Lazer and Light Instrument
LASER DIODE CONTROLLERS
LASER DIODE DRIVERS
LASER DIODE TEST SYSTEMS
LAZER DIODE MOUNTS, CABLES & ACCESSORIES
SPECTROSCOPY
MECANICS TEST EQUIPMENT
MOTOR ROTATION/PHASING METERS
VIBRATION TESTING EQUIPMENT
PROCESS/ CALLIBRATION EQUIPMENT
FIELD/HART COMMUNICATOR
FREQUENCY CALIBRATORS
MILLIAMP CALIBRATORS
MULTIFUNCTION CALIBRATORS
PRESSURE CALIBRATOR
PRESSURE TRANSMITTERS
SIGNAL CALIBRATORS
TEMPERATURE CALIBRATION
Soldering Equipment
DISPENSING EQUIPMENT
FUME EXTRACTION
HOT AIR GUNS
LEAD FORMING EQUIPMENT
PRE-HEATER
REWORK STATION
SOLDER
TELECOM TEST EQUIPMENT
COPPER TEST EQUIPMENT
FIBER OPTIC TEST EQUIPMENT
SPECTRUM ANALYZER
TV / Satellite Test Equipment
DIGITAL TV HEADENDS - DIGITAL TO TV (DTTV)
FIELD STRENGTH METERS FOR TV, CABLE AND SATELLITE

 



Uninterruptible Power Supplies (UPS) checking with Power Quality Analyzer

 

Uninterruptible Power Supplies (UPS) checking with Power Quality Analyzer

No electricity provider can ensure that an electrical supply don’t have voltage and frequency variations. The possibility of faults occurring in users’ installations or in the public distribution system remains incontrovertible and unforeseeable. 

Since information technology (IT) installations are particularly sensitive to power supply oscillation and distortions, they typically rely on an uninterruptible power supply (UPS) to deduct. 

Some configurations even include a second UPS supplied by a separate feeder, and a standby generator that can be set to start automatically three minutes after detecting a power interruption.

 

If the danger from weather or other local occurrences is great enough, some facilities will manually switch over to backup generation, ahead of time.

a_typical_contingency_supply_system_for_important_installations

Figure 1 illustrates a typical contingency supply system for important installations.

 

To help your contingency supply systems function as designed, perform the following tests during installation and then periodically (monthly or quarterly, depending on contractual agreements) after the system is commissioned.

 

Checking installation phase are divided into two stages:
1. Pre-installation – check before connecting the main loads.
2. Combined – connect main loads and check while turn standby generator off and on.

 

Pre-installation


1. UPS functional and alarms checks

Purpose: Test the functions of UPS, LED display, and alarm messages.

 

2. UPS specification checks

Purpose: Test and measure UPS specifications

Procedure: Record voltage, current, real power, apparent power, power factor, voltage and current Total Harmonic Distortion (THD) at both the input and output.

Adjust the loads from 0 to 100% in 25% steps for balanced load checking. For unbalanced load checking, follow this load matrix:

Unbalanced_load_testing_sequence

 

3. UPS burn-in check

Purpose: Clarify the UPS system can operate at the rated load under ambient room temperature conditions.

Procedure: Load the UPS to rated load and operate for 8 hours to 24 hours, depending on contractual requirements. 

Burn-in_test_records

 

4. UPS step load and bypass loss transient tests

Purpose: Demonstrate the transient response of the UPS module.

Procedure: Measure UPS transient response for:
1) 0 % to 100 % to 0 % load steps
2) 0 % to 50 % to 0 % load steps
3) 50 % to 100 % to 50 % load steps
4) UPS running with loss of bypass mains
In the example demonstrated in Figure 4, the three phase voltage waveform hardly varied, despite the 100% change in load current.

Successful_UPS_step_load_test

Successful_UPS_step_load_test_2

5. UPS start and stop test

Purpose: Focus on correct operation when the UPS is switched on and off with full load.

Procedure: With the module running at 50% and 100% load, switch the inverter OFF and ON. Record transients, load voltage, load current, mains 2 current, and mains 1 current.

 

6. UPS full load battery discharge test

Purpose: Focus on correct UPS operation for 15 minutes at full load during a power failure.

Procedure: Measure battery cells before and after discharge using a battery monitoring system.

 

7. UPS loss and return of mains test

Purpose: Focus on correct operation during loss and return of the mains.

Procedure: Run module at normal load and switch the UPS main input ON and OFF. Record transients, load voltage, load current, and mains 1 current.

 

8. UPS loss and return of battery test

Purpose: Focus on correct operation during loss and return of UPS batteries.

Procedure: Run module at normal load and switch the UPS main battery breaker ON and OFF. Record transients, load voltage, load current and mains 1 current.

 

9. UPS load transfer test

Purpose: Focus on correct operation during load transfer.

Procedure: Run module at normal load and switch UPS OFF and ON until the load is on static bypass. This procedure is reversed from static bypass to UPS. Record load voltage, load current and bypass current.

step_load_test_1

step_load_test_2

10. UPS transfer to bypass and back test

Purpose: Focus on correct operation with external bypass.

Procedure: Transfer the load to external bypass and back to UPS. Record load voltage and load current.

 

Combined test

Connect the main loads and standby generator and repeat the same tests at 0% and 100% load conditions. Monitor transfer between the mains supply, UPS, and standby generator to ensure that transients and waveform distortion stays within acceptable limits.

 

Maintenance test

Conduct periodic (monthly) maintenance tests throughout the life of the contingency supply system. Follow the combined test procedure for everything except the standby generator—it only needs to be tested once a year.

 

Conclusion

Many tests are involved when commissioning and maintaining a contingency supply system. Many parameters (three phase voltage and current, power, power factor, harmonics and transients) must be logged simultaneously over 8 hours to 24 hours and documented in report format. Use a power quality analyzer with data logging and reporting capabilities (responsible for site assessment and installation) and the service team (post-sales maintenance) in this example. 

 

Source: Fluke Application Note

 

 



TESTTEK TECHNOLOGY EQUIPMENT CO.,LTD

Address:

68 Nguyen Hue street, Ben Nghe ward, district 1, Ho Chi Minh city, Vietnam

Main Tel: +84.933 382 165 | +84 8 6288 3088

Email: Sales@testtek.com

Ⓒ Copyright 2015 TESTTEK TECHNOLOGY EQUIPMENT CO.,LTD All Rights Reserved.

Designed by: Thiết kế web rẻ 24h